A New Logistics Hub Planned Near the Port of "Yuzhny": What Will the Project Cost?
In the area of the "Yuzhny" port, plans are underway to create a warehouse and transshipment complex with four warehouses and a capacity of up to 84,000 cubic meters. Investors are being offered a project costing $8.57 million, with the potential to earn from renting out space or providing storage and transshipment services.
As reported by Delo.ua, this information comes from Inventure.
What the Project Entails
In the Odessa region, an investment project has been developed for the construction of a warehouse and transshipment complex near the "Yuzhny" port. The concept includes the creation of a logistics facility on a 7-hectare plot of land with four warehouse buildings totaling 14,688 square meters.
The total capacity of the future complex could be around 84,000 cubic meters, with the receiving department designed for a throughput of up to 150 tons of cargo per hour. The estimated construction budget, including reserves, is assessed at $6.47 million, while the total investment volume, including the purchase of the land plot, is about $8.57 million.
According to the developers' plan, the pre-project concept allows potential investors to evaluate the future configuration of the facility, its logistics capabilities, necessary capital investments, and prospects for generating income.
One of the main advantages of the project is its location near the "Yuzhny" port in the Bialyrov area, providing access to one of the largest industrial and logistics clusters in the Odessa region. The distance from the site to the marine waters is about one kilometer, creating opportunities for the development of warehousing and transshipment infrastructure.
An additional advantage is the presence of a railway line near the site, which in the future allows for the organization of an access road to the complex. The facility also has convenient road access due to its location near a transport highway, ensuring access for freight transport.
The designated area allows for the placement of not only warehouse buildings but also technological zones, an administrative building, access roads, and maneuvering areas for freight transport.
The complex can be used for storing various types of products — grains and oilseeds, meal, compound feeds, fertilizers, as well as other dry cargo. According to calculations, the facility can simultaneously store up to 60,000-63,000 tons of wheat or corn, depending on the loading technology and product characteristics.
Investors are offered several models for using the complex: renting out warehouse space, providing services for receiving, storing, and transshipping cargo, or a combined operational format.
The project may attract agricultural traders and exporters, port and logistics operators, producers and processors of agricultural products, as well as developers of warehouse real estate and strategic investors.
After the construction is completed and operational activities commence, the facility could become a full-fledged logistics asset with the potential for further capitalization and sale as a ready income-generating business.
Development Concept
The project for the construction of a warehouse and transshipment complex near the "Yuzhny" port envisions the creation of a modern logistics facility with four ground storage warehouses, a receiving department with a capacity of up to 150 tons per hour, an administrative building, and transport infrastructure.
The total area of the warehouses will be 14,688 square meters, and the capacity of the complex will be about 84,000 cubic meters. One warehouse will have an area of 3,672 m², a height of up to 13.7 meters, and will be able to store about 21,000 cubic meters of products.
Depending on the type of cargo, the complex can simultaneously accommodate up to 60,400 tons of corn, 63,000 tons of wheat, 35,200 tons of sunflower seeds, or 67,200 tons of soybeans.
The preliminary construction estimate is assessed at $5.63 million. This amount includes the construction of warehouses, an administrative building, a receiving department, a logistics area, access roads, and fencing. Including reserves for additional expenses and the purchase of the land plot, the total volume of necessary investments is about $8.57 million.
At the same time, the estimate does not yet include expenses for engineering networks, land planning, vehicle scales, and specialized equipment, which will need to be clarified after the full project development.
Disclaimer: This content is provided for general branding and informational purposes only and doesn't constitute financial, investment, legal, or tax advice. Any events, rewards, online events, or related information mentioned herein should not be considered a recommendation, solicitation, or invitation to purchase, sell, trade, or otherwise deal in any crypto assets or to use any services. Crypto assets are highly volatile and may result in loss. WEEX services and online events may not be available in all regions and are subject to applicable laws, regulations, and eligibility requirements. You are responsible for ensuring that your use of WEEX services complies with local laws and for carefully assessing the risks before participating in any crypto-related activities.
You may also like

Stripe stablecoin card program lead Connor Fitzgerald steps down

Bank of America Analysis: DRAM Prices Expected to Rise 30%-40% in Q3, AI Servers Continue to Squeeze Supply

Citigroup Analysis: AI Begins to 'Consume' NAND, Storage Upcycle Still Ongoing

Hyperliquid vs GMX Whitepaper Comparison: Which Decentralized Perpetual Exchange Has the Better Architecture?
![[Editorial] Bitcoin 'Frame War': The One Who Names Sets the Rules](/public-static/35_4563712fa2.png?format=avif)
[Editorial] Bitcoin 'Frame War': The One Who Names Sets the Rules

NVIDIA to Become a Shareholder of Upbit?

Brian Armstrong says AI agents will out-transact humans using crypto

Gemini Founder Donates $10 Million Worth of Bitcoin to Trump PAC Amid Joint Filing and Withdrawal of Settlement with CFTC

38 Books and 953 Hours of Reading: Michael Saylor Unveils His Pro-Bitcoin Program

Private Keys are Mathematics, Wallets are Business: The Chaos of Web3 Wallets in 2026

Thai SEC Criminally Charges Bitkub for Alleged False Information Disclosure

The Funding: Are crypto vaults funds and curators fund managers?

Will the Federal Reserve Really Raise Rates This Week? The Market Isn't Buying the July Decision

The End of the 'Disrupting Wall Street' Narrative: The Shift of the Crypto Sector Towards Financial Infrastructure

New Booking Rules Effective September 1: Clarifications on Salaries, Debts, and TCC Inspections

Korean Stocks Experience Seven Circuit Breaks This Year: Young People Destroyed by Leverage in a Summer of Misfortune

Goldman Sachs Interprets Minimax Founder's Meeting: MiniMax Valuation Recovery, Target Price Up Over 3 Times

The Era of AI Agents Making Payments is Coming: Tiger Research Highlights Competition in Wallet Industry

Dragonfly Partner Haseeb Talks Crypto VC: Sorry, Some Things Will Never Come Back

Changxin Becomes the New King of A-shares: How to Reasonably Value It?

Crossing Boundaries is Difficult: Predictive Markets and Perp DEX Leaders Have Yet to Replicate Themselves

New Russian Law Takes Effect, The Suspense of A7A5 Has Just Begun

EU Approves 21st Sanctions Against Russia, Expands Ban on Transactions with Cryptocurrency Platforms

Web3 Decentralized Storage Explained: IPFS, Filecoin, Arweave, Reconstructing the Underlying Infrastructure of Digital Data

From 'Fear of Missing Out' to 'Fear of Holding': How Long Will the Momentum Sell-off Last?

Hashed Open Research Analyzes Southeast Asia's Rise as a 'Practical Stage' for Digital Assets

Kazakhstan Approves Mining System Incorporating Contributions to National Cryptocurrency Reserves

Subscriptions in Dollars: How to Optimize Spending on Streaming Platforms

Deductions for Purchases from Small Taxpayers: The Veracity of Transactions vs. Mere Formality







